Example forecast specification.
The structure of a transition forecast: defined proposition, frozen evidence cutoff, declared baselines, objective resolution rule.
Forecast specification
The fields that define this proposition
These fields are what make the proposition resolvable and scoreable.
An example. The live record is FF-001.
nc-39c02226c4ad How to verify Computed from the declared historical cohort
Frozen rules scored on the same cohort
Structured elicitation under the same resolution rule
Controlled prompt baseline with version recorded
CMS publishes a final national coverage determination that expands access beyond the current restricted coverage.
Upstream states at freeze
Rung 1–4 states locked at evidence cutoff
Rungs 1–4 record the public evidence state at cutoff. Later evidence belongs to a new registration.
Bottleneck diagnosis
Where the transition chain is limiting
The rung currently limiting downstream movement.
Rung 4→5 translation: Insufficient real-world confirmation to trigger guideline procedural signal, which historically precedes coverage expansion.
The transition is likely to stall at rung 4 → 5 because real-world evidence confirmation has not yet reached the threshold that historically precedes guideline procedural signals. Until RWE signals strengthen, the momentum for authority action remains low.
Every forecast we register
What comes with the specification
Scoring means nothing unless the forecast is sealed off from hindsight and from your internal context. Four things hold that line.
What it's for
Built to arrive before a date you already have.
A brief is registered against a decision date you bring — a coverage review, a launch gate, an evidence strategy window. The probability and its frozen evidence state go on the record ahead of that date, giving your team a dated basis to work from while the authority's process is still open.
Whether earlier notice changes the decision is itself under test, not an established result. See Programs.